February 17 2016

City of North Ridgeville selects Mull & Weithman for new Fire Station

On February 16, 2016 the North Ridgeville City Council voted to approve Mull & Weithman’s contract for the replacement of the main fire station. In November of last year voters approved an $8.1 million bond issue to finance the new station and purchase the land. The City and Fire Department have been seeking to replace the existing fire station including;

  • Fire Station #1 was built in 1957 for an all-volunteer fire force serving less than 8,000 residents. In 1967 the department began full-time staffing and in 1981 an addition was added, but still left the station inadequate. More than fifty years later, the station is now serving nearly 32,000 residents.
  • Fire Station #1 is the only full-time fire station in Northeast Ohio that is utilizing a mobile home for living space.
  • The current station is undersized and has inadequate restroom facilities for the number of staff.
  • Firefighter turnout gear storage is non-existent and the station is lacking apparatus space which leaves expensive equipment outside in the weather.
  • The station is located 200 feet from one of the city’s busiest intersections with no traffic control devices in place for access/exit from the station.
  • The current location is not conducive with the continued growth of the city.
  • Fire prevention and training offices are non-existent and the current classroom is makeshift and significantly undersized.
  • The station lacks a clean room for medical supplies and equipment, a decontamination room to clean dirty medical equipment and an adequate location to service and fill self-contained breathing apparatus.

The proposed North Ridgeville Fire Station #1 will act as the new headquarters station for North Ridgeville and will contain 21,904 s.f. and be fully ADA compliant. It has been designed as a 2-story structure with a basement to minimize the site footprint. Interior spaces include 4 apparatus bays with adjacent ancillary spaces and administrative offices. Features for training purposes include a 3-story training tower (high angle rescue, hose advancement, rappelling and several sprinkler system training aids) a training classroom, a work-out room for Physical Fitness Training, areas for bailing from mock second floor window openings, and an area for confined space rescue. The second floor will contain the living quarters.

 

Tags: